December 13, 2018

Fanfare as final steel beam — signed by employees — installed for new Medical Center tower

Bearing hundreds of employee signatures, the ceremonial final steel beam is placed Dec. 11 as part of the helipad ramp for the future Medical Center tower.

A crowd of several hundred administrators, employees, construction workers and community members watched during a Dec. 11 Topping Off Ceremony as the ceremonial final steel beam was put in place on top of the future Medical Center tower at Loma Linda University Health.  

Illuminated with hundreds of colorful signatures added by employees Dec. 6 and 7, the beam was lifted and lowered into place by a crane to become part of the tower’s helipad ramp. The beam was also traditionally adorned with an evergreen tree on one side and the American flag on the other. 

To find out why, see photos of the Topping Off, and learn more about the future home of Loma Linda University Medical Center and a new Children’s Hospital tower, read the full story at news.llu.edu.

Share